The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization
The prediction of construction cost of metro shield engineering is of great significance to project management. In this study, we used the rough set theory, a backpropagation (BP) neural network, and quantum particle swarm optimization (QPSO) to establish a prediction model for predicting the metro...